HNZG Optical Technology Group. It is a leading manufacturer and supplier for the photonics & electromechanical products.
Established in the year of 1968, the company has 4,500 employees. With rich of experienced and excellent technicians including doctors and masters. It has advanced intellectual property & technology center, optical thin film engineering and research center.
The total asset of the company is 1.3 billion RMB with 620 thousand square meters production area and 200 thousand square meters building area. The annual revenue is more than 1.2 billion RMB.
Taking the development of photonics industry as the main direction, the company has strong capability in the domains of optics, electronics and mechanics. The products are optical components and parts, lenses, light engines, projectors, video walls, surveillance systems, elevators and electrical parts.
As a top grade photonics company, the technology of optical components of the company is in the leading position in the world. The productivity of the company ranks the top grade in the domestic industry. The yield capability of the company is billions of components. The market shares of X-cube and TIR prisms are the No. 1 in the global market respectively. The coating equipment level and industrialization level of the company rank the leading position in China and multiple core technologies are possessed. The company has great advantages in the projection industry. Annual yield capability of 1.5 million optical components of projection system, 1 million units of projectors and 5 thousand sets of video wall systems, great R & D and production capability and engineering experiences in the surveillance systems are possessed by the company.
Products
Optical element assembly
High Precision lens
Color combination prism
TIR air gap prism and projection system lens
Peripheral microprism
Precision optical film
Functional optical film
…
The market share of color combination prisms, TIR air wedge prisms, etc. exceeds 70% in the industry segment, ranking first in the world
The company is the premium supplier of global famous companies including CANON, EPSON, SONY, ZEISS and SAMSUANG. The company has been best suppliers for the EPSON and CANON. The annual exportation is over 80 million dollars.